A1267/25
NOTAM Active
Approach Procedures

Instrument approach procedures for non-RNAV 1 equipped aircraft for runways 28R and 10L are not available.

2025-04-28 10:10 - 2025-07-28 23:59

Period of Applicability

2025-04-28 10:10 - 2025-07-28 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Instrument approach procedures for non-RNAV 1 equipped/capable aircraft for runways 28R and 10L are not available, as referenced in the AIP EIDW AD 2.22 Flight Procedures, sections 2.3 and 2.4.

Message

INSTRUMENT APPROACH PROCEDURES FOR NON-RNAV 1 EQUIPPED/CAPABLE AIRCRAFT FOR RUNWAYS 28R AND 10L NOT AVAILABLE, REF AIP EIDW AD 2.22 FLIGHT PROCEDURES, SECTION 2.3 AND 2.4

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1267/25 NOTAMR A0618/25
Q) EISN/QPIXX/IV/NBO/AE/000/999/5325N00616W005
A) EIDW B) 2504281010 C) 2507282359 EST
E) INSTRUMENT APPROACH PROCEDURES FOR NON-RNAV 1 EQUIPPED/CAPABLE 
AIRCRAFT FOR RUNWAYS 28R AND 10L NOT AVAILABLE,
REF AIP EIDW AD 2.22 FLIGHT PROCEDURES, SECTION 2.3 AND 2.4
Issued at: 2025-04-28 10:12
Was this helpful?