5/7993
Checking status...
Approach Procedures

ILS or LOC approach for runway 10R at Pittsburgh International Airport has been amended.

2025-03-26 13:49 - 2025-08-13 13:49

Period of Applicability

2025-03-26 13:49 - 2025-08-13 13:49

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

The ILS or LOC approach for runway 10R at Pittsburgh International Airport has been amended (Amendment 11). The missed approach procedure requires climbing to 1900 feet and then a right turn.

Message

IAP PITTSBURGH INTL, PITTSBURGH, PA. ILS OR LOC RWY 10R, AMDT 11 ... ILS RWY 10R (SA CAT I), AMDT 11 ... ILS RWY 10R (CAT II AND III), AMDT 11 ... MISSED APPROACH: CLIMB TO 1900 THEN CLIMBING RIGHT TU...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZOB/QXXXX/I/NBO/A/000/999/4029N08013W025
A) KPIT
B) 2412261554
C) 2503271552EST
E) IAP PITTSBURGH INTL, PITTSBURGH, PA.
ILS OR LOC RWY 10R, AMDT 11 ...
ILS RWY 10R (SA CAT I), AMDT 11 ...
ILS RWY 10R (CAT II AND III), AMDT 11 ...
MISSED APPROACH: CLIMB TO 1900 THEN CLIMBING RIGHT TURN TO 5000 DIRECT HLG VOR/DME AND HOLD.
RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
AGC VOR OUT OF SERVICE
Issued at: 2025-03-26 13:49
Was this helpful?