5/7992
Checking status...
Approach Procedures

Amendments to ILS or LOC procedures for runways 28L and 28R at Pittsburgh International Airport.

2025-03-26 13:49 - 2025-08-13 13:49

Period of Applicability

2025-03-26 13:49 - 2025-08-13 13:49

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Amendments to the ILS or LOC procedures for runways 28L and 28R at Pittsburgh International Airport, including the requirement for radar for procedure entry except for equipped aircraft.

Message

IAP PITTSBURGH INTL, PITTSBURGH, PA. ILS OR LOC RWY 28L, AMDT 11... ILS OR LOC RWY 28R, AMDT 10A... ILS RWY 28R (SA CAT I-II), AMDT 10A.... RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED ...

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZOB/QPIXX/I/NBO/A/000/999/4029N08013W005
A) KPIT
B) 2403280552
C) 2411070552EST
E) PIT PITTSBURGH INTL, PITTSBURGH, PA.
ILS OR LOC RWY 28L, AMDT 11...
ILS OR LOC RWY 28R, AMDT 10A...
ILS RWY 28R (SA CAT I-II), AMDT 10A....
RADAR REQUIRED FOR PROCEDURE ENTRY EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS,
AGC VOR U/S.
Issued at: 2025-03-26 13:49
Was this helpful?