A2358/25
NOTAM Active
Runway Operations

Runway 17R/35L closed due to work in progress; runway 17L/35R open.

2025-04-28 22:00 - 2025-04-29 01:00

Period of Applicability

2025-04-28 22:00 - 2025-04-29 01:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

Runway 17R/35L is closed due to work in progress, while runway 17L/35R remains open. The lighting system for runway 17R/35L is currently being tested, and runway crossings are being managed on a tactical basis. Reference AIP AD 2 LIMC 2-1 for more details.

Message

RWY 17R/35L CLSD DUE TO WIP RWY 17L/35R OPEN. RMK: LGT SYSTEM RWY 17R/35L ON TEST RWY XNG ON TACTICAL BASIS REF AIP AD 2 LIMC 2-1

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2358/25 NOTAMN
Q) LIMM/QMRXX/IV/NBO/A /000/999/4538N00843E005
A) LIMC B) 2504282200 C) 2504290100
E) RWY 17R/35L CLSD DUE TO WIP
RWY 17L/35R OPEN.
RMK: LGT SYSTEM RWY 17R/35L ON TEST
RWY XNG ON TACTICAL BASIS
REF AIP AD 2 LIMC 2-1
Issued at: 2025-04-28 09:30
Was this helpful?