U2568/25
Checking status...
Runway Operations

New runway and taxiways under construction parallel to runway 04/22; not in use.

2025-06-04 16:00 - 2025-07-09 15:59

Period of Applicability

2025-06-04 16:00 - 2025-07-09 15:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, cancel anytime

Interpretation

New runway and taxiways are under construction parallel to runway 04/22 and are not in use. The new runway is located 380 meters east of the runway 04/22 centerline, and two new taxiways are located 190 meters and 565 meters east of the runway 04/22 centerline.

Message

NEW RWY AND TWYS ARE UNDER CONSTRUCTION PARALLEL TO RWY04/22,NOT IN USE. POSITION AS FLW: 1.NEW RWY: 380M EAST OF RWY04/22 CL. 2.TWO NEW TWYS: 190M EAST OF RWY04/22 CL AND 565M EAST OF RWY04/22 CL.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

U2568/25 NOTAMN
Q) ZPKM/QFAXX/IV/NBO/A/000/999/2506N10257E005
A) ZPPP B) 2506041600 C) 2507091559 
E) NEW RWY AND TWYS ARE UNDER CONSTRUCTION PARALLEL TO 
RWY04/22,NOT IN USE. POSITION AS FLW:
1.NEW RWY: 380M EAST OF RWY04/22 CL.
2.TWO NEW TWYS: 190M EAST OF RWY04/22 CL AND 565M EAST OF RWY04/22 
CL.
Issued at: 2025-06-03 10:02
Was this helpful?