Period of Applicability
2026-06-15 20:30 - 2026-12-31 07:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Construction is ongoing with a crane 25.5 m high, an excavator 8.5 m high, and a concrete pump 18 m high within PSN S08 19 E157 16. New ATS tower site is 48 m east of the apron. Schedule: Mon-Sat daily 2030-0700 UTC.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?