OBSConstruction Activity

Construction obstacles are erected at the ATS tower site.

2026-06-15 20:30 - 2026-12-31 07:00
Duration:aggregated 3 months EST

Period of Applicability

2026-06-15 20:30 - 2026-12-31 07:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction is ongoing with a crane 25.5 m high, an excavator 8.5 m high, and a concrete pump 18 m high within PSN S08 19 E157 16. New ATS tower site is 48 m east of the apron. Schedule: Mon-Sat daily 2030-0700 UTC.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A0098/26 NOTAMR A0038/26
Q)AGGG/QOBCE/IV/BO/A/000/999/
A)AGGM B)2606152030 C)2612310700 EST
D)MON-SAT/DLY 2030 - 0700 UTC
E)CTN, CRANE HGT 25.5M (84FT) EXCAVATOR HGT 8.5M (28FT) AND CONCRETE
PUMP HGT 18M (60FT) WIP WI PSN: S08 19 E157 16. NEW ATS TWR SITE
48M E OF APN.