A9848/26
Checking status...
ADRunway Operations

Runways 09/27 and 17/35 are dry; CRFI is not reported.

2026-11-05 21:23 - 2026-11-06 13:00
Duration:VERY SHORT16 hours

Period of Applicability

2026-11-05 21:23 - 2026-11-06 13:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway surfaces 09/27 and 17/35 are dry from November 5 at 2045 to November 6 at 1300. Canadian Runway Friction Index (CRFI) is not reported for either runway; the next observation is scheduled for November 6 at 1300.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9848/26 NOTAMR A9776/26
Q) CZWG/QFAXX/IV/NBO/A/000/999/5408N10831W005
A) CYLJ B) 2611052123 C) 2611061300
E) RSC 09/27 DRY. VALID NOV 05 2045 - NOV 06 1300.
RSC 17/35 DRY. VALID NOV 05 2045 - NOV 06 1300.
ADDN NON-GRF/TALPA INFO:
CRFI 09/27 NR.
CRFI 17/35 NR.
RMK: NEXT OBS AT NOV 06 1300.
Was this helpful?