A9911/26
Checking status...
ADRunway Operations

Runways 06/24 and 15/33 are dry; CRFI is not reported.

2026-11-06 00:28 - 2026-11-07 00:28
Duration:SHORT1 day

Period of Applicability

2026-11-06 00:28 - 2026-11-07 00:28

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runways 06/24 and 15/33 are dry from November 6 at 0027 to November 6 at 1100. CRFI is not reported for either runway; the next observation is scheduled for November 6 at 1100.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A9911/26 NOTAMR A9875/26
Q) CZWG/QFAXX/IV/NBO/A/000/999/5548N09752W005
A) CYTH B) 2611060028 C) 2611070028
E) RSC 06/24 DRY. VALID NOV 06 0027 - NOV 06 1100.
RSC 15/33 DRY. VALID NOV 06 0027 - NOV 06 1100.
ADDN NON-GRF/TALPA INFO:
CRFI 06/24 NR.
CRFI 15/33 NR.
RMK: NEXT OBS AT NOV 06 1100.
Was this helpful?