A1703/26
EST
Checking status...
ADRunway Operations

Work in progress on the left side of runway 08 with men and equipment present.

2026-05-26 08:45 - 2026-07-24 08:30
Duration:2 months EST

Period of Applicability

2026-05-26 08:45 - 2026-07-24 08:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work in progress on the left side of runway 08, 800 m from threshold 08 and 30 m to the runway centre line, with men and equipment present. Follow tower instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1703/26 NOTAMR A1014/26
Q)DAAA/QMRHW/IV/BO/A/000/999/2249N00527E005
A)DAAT B)2605260845 C)2607240830 EST
E)WIP ON LEFT SIDE RWY 08. 800M FM THR 08 AND 30M TO RCL
MEN AND EQPT PRESENCE. FLW TWR INSTRUCTIONS
Was this helpful?
    Work in progress on the left side of runway 08 with men and equipment present. - DAAT NOTAM | Notamify