V0890/26
Checking status...
NavDeparture Procedures

RWY 25 ROTWE 5B climb requirements are amended, with BRNAV equipment required after passing 5000 ft.

2026-10-02 14:59 - 2027-01-13 22:59
Duration:LONG4 months

Period of Applicability

2026-10-02 14:59 - 2027-01-13 22:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For the RWY 25 SIDs, the ROTWE 5B ATC climb requirement is changed to 275 ft/NM up to 5000 ft. After passing 5000 ft, BRNAV equipment is required. The changes are due to LBU VOR/DME coverage limitations.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0890/26 NOTAMN Q) EDGG/QPICH/I/BO/A/000/999/4841N00913E005 A) EDDS B) 2610021459 C) 2701132259 E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE AMENDMENT SID RWY 25 (ABTAL 4B, DKB 9B, ETASA 4B, GEBNO 7B, KRH 5B, KUNOD 2B, OKIBA 4B, ROTWE 5B, STG 2B, SUL 3B, TAGIK 4B, TEDGO 1B, VESID 4B). CHG ROTWE 5B ATC CLIMB RATE TO: 275FT/NM TO 5000. V/V FPM: 60/275; 120/550; 180/825; 240/1100; 300/1375; 360/1650. AFTER PASSING 5000, BRNAV EQPT NECESSARY. CHGS DUE TO LBU VOR/DME COVERAGE LIMITATIONS.
Was this helpful?