A1940/26
EST
Checking status...
NavDeparture Procedures

Dublin RWY 28L CAT A and B SIDs require an increased climb gradient due to a crane.

2026-05-11 17:58 - 2026-08-10 18:00
Duration:aggregated 28 days EST

Period of Applicability

2026-05-11 17:58 - 2026-08-10 18:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Standard instrument departures for Dublin RWY 28L CAT A and B via BEPAN1B, OLONO1B and ABIDO1B require an increased climb gradient until 900 ft of 4.9 percent for obstacle clearance due to erection of a crane during MON-FRI 0800-1800.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1940/26 NOTAMN
Q) EISN/QPICH/I /NBO/A /000/999/5325N00616W005
A) EIDW B) 2605111758 C) 2608101800EST
D) MON-FRI 0800-1800
E) STANDARD INSTRUMENT DEPARTURES DUBLIN RWY 28L CAT A,B
VIA BEPAN1B, OLONO1B, ABIDO1B
INCREASED CLIMB GRADIENT UNTIL 900FT OF 4.9 PERCENT REQUIRED FOR
OBSTACLE CLEARANCE DUE ERECTION OF CRANE
REF: AIP EIDW AD 2.24-10.1
Was this helpful?