W0722/26
Checking status...
NavApproach Procedures

US DoD E-IPL RNP RWY 29 approach minima and visibility requirements changed.

2026-10-29 15:10 - 2026-11-26 00:01
Duration:28 days

Period of Applicability

2026-10-29 15:10 - 2026-11-26 00:01

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

For US DoD E-IPL only, the RNP RWY 29 instrument approach procedure is changed. When the approach lighting system (ALS) is inoperative, increase visibility to 1400 m. Revised LPV decision altitude and visibility minima are: A 465 ft/800 m, B 477 ft/800 m, C 485 ft/800 m, and D 495 ft/800 m. All other data is unchanged.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

W0722/26 NOTAMN Q) ESAA/QPICH/IV/NBO/A/000/999/5824N01541E005 A) ESSL B) 2610291510 C) 2611260001 E) AERODROME [US DOD E-IPL ONLY] INSTRUMENT APPROACH PROCEDURE RNP RWY 29 CHANGED; CHG AS FOLLOWS: BRIEFING BAR - CHG *WHEN ALS INOP, INCREASE VIS TO 1400M; MINIMA - CHG LPV DA* CAT A 465-800M 287 (300-800M); CAT B 477-800M 299 (300-800M); CAT C 485-800M 307 (400-800M); CAT D 495-800M 317 (400-800M). REST DATA UNCHG.
Was this helpful?