6/0391
EST
Checking status...
NavDeparture Procedures

Rockies Seven Departure DOVE CREEK and MONTROSE Transitions require suitable RNAV with GPS; MTJ VOR is out of service.

2026-06-24 14:40 - 2027-02-03 14:40
Duration:VERY LONG8 months EST

Period of Applicability

2026-06-24 14:40 - 2027-02-03 14:40

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

At Buckley Space Force Base, the Rockies Seven Departure DOVE CREEK Transition and MONTROSE Transition are not authorized except for aircraft equipped with a suitable RNAV system with GPS; MTJ VOR is out of service.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Message

BUCKLEY SPACE FORCE BASE, AURORA, CO. ROCKIES SEVEN DEPARTURE... DOVE CREEK TRANSITION,MONTROSE TRANSITION NA EXCEPT FOR ACFT EQUIPPED WITH SUITABLE RNAV SYSTEM WITH GPS, MTJ VOR OUT OF SERVICE.

Was this helpful?