10/031
Checking status...
ADTaxiway Operations

An open excavation beside taxiway A is lighted and barricaded.

2026-10-24 10:19 - 2026-11-20 23:00
Duration:28 days

Period of Applicability

2026-10-24 10:19 - 2026-11-20 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

An open excavation associated with work in progress is adjacent to the west edge of taxiway A between the Hangar 30 ramp and taxiway G. The excavation is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Message

TWY A BTN HANGAR 30 RAMP AND TWY G WIP OPN EXCAVATION ADJ WEST EDGE LGTD AND BARRICADED

Was this helpful?