ADApron Operations

Construction work beside a drainage grate on the northeast side of Apron North is lighted and barricaded.

2026-11-04 11:34 - 2026-12-31 20:00
Duration:2 months

Period of Applicability

2026-11-04 11:34 - 2026-12-31 20:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress on a 200-foot section of the northeast side of Apron North, adjacent to a drainage grate. The work area is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Message

APRON NORTH APN NE 200FT WIP CONST ADJ NE SIDE DRAINAGE GRATE LGTD AND BARRICADED