M0567/26
Checking status...
ADTaxiway Operations

Taxiway A construction includes a barricaded excavation near the A2 intersection.

2026-10-15 02:14 - 2027-01-09 04:59
Duration:3 months

Period of Applicability

2026-10-15 02:14 - 2027-01-09 04:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Construction work is in progress on taxiway A, with an open excavation adjacent to the taxiway A2 intersection. Use caution; the excavation is lighted and barricaded.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M0567/26 NOTAMN Q) ZDC/QMXHW/IV/M/A/000/999/3649N07601W005 A) KNTU B) 2610150214 C) 2701090459 E) TWY A WORK IN PROGRESS CONST OPEN EXCAVATION ADJACENT TO TWY A2 INTERSECTION UTILIZE CAUTION LGTD AND BARRICADED