6/2470
EST
Checking status...
NavDeparture Procedures

Runway 22 takeoff obstacle notes add temporary construction equipment.

2026-09-11 15:47 - 2026-11-18 15:47
Duration:3 months EST

Period of Applicability

2026-09-11 15:47 - 2026-11-18 15:47

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

St. Pete-Clearwater International takeoff minimums and obstacle departure procedures Amendment 3B is changed to add a takeoff obstacle note for Runway 22: temporary construction equipment is located 1,050 feet from the departure end of runway, 427 feet right of centerline, at 35 feet AGL and 49 feet MSL. All other data remains as published.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1536/26 NOTAMN Q) KZMA/QPOCH/I/NBO/A/000/999/2754N08241W005 A) KPIE B) 2609111547 C) 2611181547 E) ODP ST PETE-CLEARWATER INTL, ST PETERSBURG-CLEARWATER, FL. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 3B... TAKEOFF OBSTACLE NOTES: RWY 22, TEMPORARY CONSTRUCTION EQUIPMENT, 1050FT FROM DER, 427FT RIGHT OF CENTERLINE, 35 AGL/49 MSL (2023-ASO-10644-NRA). ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?