6/0982
EST
Checking status...
OpsFlight Procedures

KSAC ODP RWY 30 takeoff minimums and climb requirements amended.

2026-01-06 18:23 - 2028-01-06 18:23
Duration:VERY LONG25 months EST

Period of Applicability

2026-01-06 18:23 - 2028-01-06 18:23

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Sacramento Executive (KSAC) obstacle departure procedure/takeoff minimums for RWY 30 are amended: takeoff minimums 300-1 1/4 or standard with minimum climb of 209 ft/NM to 300 ft; alternatively, with standard takeoff minimums and a normal 200 ft/NM climb gradient, takeoff must occur no later than 1300 ft prior to the DER. Effective 2601061823-2801061823 EST.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

Q) KZOA/QPDCH/I/NBO/A/000/999/3830N12129W005
A) KSAC
B) 2601061822
C) 2608181818EST
E) SAC SACRAMENTO EXEC, SACRAMENTO, CA.
TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES ORIG-A...
TKOF MNM: RWY 30: 300-1 1/4 OR STANDARD WITH MINIMUM CLIMB OF 209 FT/NM TO 300. ALTERNATIVELY, WITH STANDARD TAKEOFF MINIMUMS AND A NORMAL 200 FT/NM CLIMB GRADIENT, TAKEOFF MUST OCCUR NO LATER THAN 1300 FT PRIOR TO DER.
ALL OTHER DATA REMAINS AS PUBLISHED.
Was this helpful?