Period of Applicability
2026-09-09 10:20 - 2027-04-21 10:20
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Zamperini Field Takeoff Minimums and (Obstacle) Departure Procedures Amendment 1A is revised to add a Runway 11L takeoff obstacle note identifying five drilling rigs left of centerline, located 414 to 1,199 feet from the departure end of runway and reaching up to 38 feet AGL/133 feet MSL. All other data remains as published.
Map Visualization
Message
ZAMPERINI FLD, TORRANCE, CA. TAKEOFF MINIMUMS AND (OBSTACLE) DEPARTURE PROCEDURES AMDT 1A... ADD TAKEOFF OBSTACLE NOTE: RWY 11L, DRILLING RIG 414FT FROM DER, 394FT LEFT OF CENTERLINE, 33FT AGL/133FT MSL (2024-AWP-6823-NRA), DRILLING RIG 721FT FROM DER, 552FT LEFT OF CENTERLINE, 38FT AGL/133FT MSL (2024-AWP-6824-NRA), DRILLING RIG 821FT FROM DER, 641FT LEFT OF CENTERLINE, 38FT AGL/133FT MSL (2024-AWP-6828-NRA). DRILLING RIG 844FT FROM DER, 431FT LEFT OF CENTERLINE, 23FT AGL/123FT MSL (2024-AWP-6821-NRA), DRILLING RIG 1199FT FROM DER, 452FT LEFT OF CENTERLINE, 38FT AGL/133FT MSL (2024-AWP-6830-NRA). ALL OTHER DATA REMAINS AS PUBLISHED.