V0005/26
Checking status...
NavApproach Procedures

RNAV (GPS) RWY 13 minima changed.

2026-02-26 14:37 - 2026-12-31 23:59
Duration:VERY LONG11 months

Period of Applicability

2026-02-26 14:37 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The RNAV (GPS) RWY 13 instrument approach procedure minima have been changed: LNAV MDA: CAT AB 640-1 630 (700-1); CAT CDE 640-1 3/4 630 (700-1 3/4). Circling: CAT AB 640-1 630 (700-1); CAT C 640-1 3/4 630 (700-1 3/4); CAT D 640-2 630 (700-2); CAT E 760-2 3/4 750 (800-2 3/4).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

V0005/26 NOTAMN
Q) ZMA/QPICH/I/BO/A/000/999/2828N08033W005
A) KXMR
B) 2602261437
C) 2612312359
E) [US DOD PROCEDURAL NOTAM] INSTRUMENT APPROACH PROCEDURE CHANGED RNAV (GPS) RWY 13 MINIMA TO THE FOLLOWING: LNAV MDA: CAT AB 640-1 630 (700-1); CAT CDE 640-1 3/4 630 (700-1 3/4). CIRCLING: CAT AB 640-1 630 (700-1); CAT C 640-1 3/4 630 (700-1 3/4); CAT D 640-2 630 (700-2); CAT E 760-2 3/4 750 (800-2 3/4).
Was this helpful?