Period of Applicability
2026-10-29 00:00 - PERM
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Effective 29 October 2026, the EPAMA5B SID textual description in AD 2-LEPA/LESJ SID 2.3 is corrected to require crossing EPAMA at FL120 or above, rather than FL100 or above; the stated routing remains unchanged.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?