B7339/26
Checking status...
ADRunway Operations

LETO-03-C-B arresting system is available with PPR.

2026-09-12 12:30 - 2026-11-12 12:30
Duration:3 months

Period of Applicability

2026-09-12 12:30 - 2026-11-12 12:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

LETO-03-C-B arresting system is available with 20 minutes’ prior permission required (PPR).

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B7339/26 NOTAMN
Q) LECM/QMHXX/IV/BO /A /000/999/4030N00327W005
A) LETO B) 2609121230 C) 2611121230
E) ARRESTING SYSTEM LETO-03-C-B AVBL WITH PPR 20 MIN
Was this helpful?