C3921/26
Checking status...
OBSConstruction Activity

A fence impacts the Runway 35 landing funnel obstacle limitation surface.

2026-09-29 09:28 - 2026-12-31 23:59
Duration:LONG4 months

Period of Applicability

2026-09-29 09:28 - 2026-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The Runway 35 landing funnel obstacle limitation surface is impacted by an approximately 3-metre-high fence.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C3921/26 NOTAMR C2527/26
Q) LFFF/QMRXX/IV/NBO/A /000/999/4819N00401E005
A) LFQB B) 2609290928 C) 2612312359
E) LDG FUNNEL RWY 35 OBSTACLE LIMITATION SURFACE IMPACTED BY THE
FENCE APPROXIMATIVELY 3M HIGH.
Was this helpful?