A2224/26
Checking status...
ADRunway Operations

Runway 17R/35L maintenance continues with phase 3 restrictions, unserviceable runway guard lights, and taxiway K limitations.

2026-05-10 03:45 - 2026-06-10 23:59
Duration:2 months

Period of Applicability

2026-05-10 03:45 - 2026-06-10 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Milano/Malpensa (LIMC) extraordinary maintenance works on runway 17R/35L are in force from 16 March to 10 June 2026. Current status of working phases: phases 1 and 2 are completed, and phase 3 is in force with the following additional regulations: noise abatement scenarios are in force from 2200 to 0400 without 15 minutes tolerance; runway guard lights (RGL) CAT II/III located on TWY BE, BW, EM, EW, DE, DM, F and WB are unserviceable; and TWY K between APN TWY N and APN TWY T, both included, is downgraded and available only for aircraft with wingspan up to 68.5 m.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A2224/26 NOTAMR A2220/26
Q) LIMM/QFAHW/IV/BO /A /000/999/4538N00843E005
A) LIMC B) 2605100345 C) 2606102359
E) SUP S9/26 'AD MILANO/MALPENSA (LIMC): EXTRAORDINARY MAINTENANCE
WORKS ON RWY 17R/35L' IN FORCE FM 16 MAR TO 10 JUN 2026.
CURRENT STATUS OF WORKING PHASES:
- PHASE 1: COMPLETED
- PHASE 2: COMPLETED
- PHASE 3: ACT WITH FLW ADDN REGULATIONS:
1. NOISE ABATEMENT SCENARIOS WILL BE IN FORCE FM HR 2200 TO 0400
WITHOUT 15 MINUTES TOLERANCE
2. RUNWAY GUARD LIGTHS (RGL) CAT II/III LOCATED ON TWY BE, BW, EM,
EW, DE, DM, F AND WB
UNSERVICABLE
3. TWY 'K' BTN APN TWY 'N' AND APN TWY 'T' (BOTH INCLUDED)
DOWNGRADED AND AVBL ONLY FOR ACFT WITH WINGSPAN UP TO 68.5M
Was this helpful?