Period of Applicability
2026-05-14 00:00 - 9999-12-31 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Pages AD LIPL 1-1.4 and AD LIPL 1-1.5 published with AIRAC 5/26 in the checklist and cover sheets are to be considered non-existent due to misprint. Refer to FLIP C/N Italy cover sheets 'FLIP AIRAC AMDT A5/26' page 1 and checklist CN-34.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?