J4210/26
Checking status...
OBSCrane Operations

Two mobile tower cranes are present before runway 23 threshold within the approach/climb surface.

2026-10-05 07:58 - 2027-01-05 14:00
Duration:LONG4 months

Period of Applicability

2026-10-05 07:58 - 2027-01-05 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Two mobile tower cranes are present due to construction work approximately 2,730 m before runway 23 threshold within the approach/climb surface. Crane 1 reaches 75 m (246 ft) AMSL and Crane 2 reaches 69 m (226 ft) AMSL within the specified coordinate areas. Follow tower instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

J4210/26 NOTAMN
Q) LTAA/QOBCE/IV/M  /AE/000/003/3700N03519E001
A) LTAF B) 2610050758 C) 2701051400
E) PRESENCE TWO MOBILE TWR CRANES APPROXIMATELY 2730M BEFORE THR 23
AT APPROACH/CLIMB SURFACE DUE TO CONST WORKS.
NOTE: ADVISE TWR INSTRUCTIONS.
CRANE-1 AREA:
370016N0351906E
370014N0351909E
370012N0351907E
370014N0351904E
HGT: 75 METER (246FT) AMSL
CRANE-2 AREA:
370016N0351906E
370019N0351908E
370017N0351911E
370014N0351909E
HGT: 69 METER (226FT) AMSL
Was this helpful?