Period of Applicability
2026-11-06 00:00 - 2027-02-05 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Construction equipment at a construction site on the south aerodrome boundary temporarily penetrates the obstacle limitation surfaces (OLS), with a maximum height of 130 ft AMSL.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?