B3816/26
Checking status...
ADTaxiway Operations

Work on strips between taxiways B and C; personnel and equipment will be removed for aircraft operations.

2026-10-31 16:53 - 2026-12-15 14:00
Duration:2 months

Period of Applicability

2026-10-31 16:53 - 2026-12-15 14:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the strips between taxiways B and C. Personnel and equipment will be removed for aircraft operations.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

B3816/26 NOTAMN
Q) MMFR/QMWHW/IV/M/A/000/999/2758N11055W002
A) MMGM
B) 2610311653
C) 2612151400
E) STRIPS INT TWYS B AND C WIP MEN AND EQPT WILL BE REMOVED FOR ACFT OPS
Was this helpful?