A1718/23
Checking status...
ADLighting Systems

New PAPI for RWY 08 and RWY 26 has been installed and is operational.

2023-05-24 15:13 - 9999-12-31 23:59
Duration:VERY LONG97114 months

Period of Applicability

2023-05-24 15:13 - 9999-12-31 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

New PAPI for RWY 08 and RWY 26 has been installed and is operational with the specified side, angle, and MEHT. Amend AIP page AD 2-4 OIBA item 2.14.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1718/23 NOTAMN Q)OIIX/QLPCS/IV/BO/A/000/999/ A)OIBA B)2305241513 C)PERM E)NEW PAPI FOR RWY 08 AND RWY 26 INSTALLED AND OPR AS FLW SPECIFICATIONS: - RWY 08 PAPI LEFT/3 DEG, MEHT 16 M/52.5 FT, - RWY 26 PAPI LEFT/3 DEG, MEHT 17.5 M/57.5 FT, AMEND AIP PAGE AD 2-4 OIBA ITEM 2.14 .