Period of Applicability
2026-11-01 07:20 - 2026-11-15 19:00
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Crane operations at a construction site approximately 416 m landside of LCA and laterally west of the runway centerline, within the specified coordinates. Maximum elevation is 73 m AMSL. Operations are scheduled for the 1st from 0720 to 1900 and the 2nd through 15th from 0500 to 1900.