Period of Applicability
2026-08-29 10:32 - 2026-11-28 23:59
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Mobile cranes are erected for construction work in designated Areas A through F and the tunnelling construction (TC) area. Maximum heights are 25.7 m AGL in Areas A and F, 19.2 m AGL in Areas B and E, 40.0 m AGL in Areas C and D, and 15.0 m AGL in the TC area. Red obstruction lights are installed on top.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?