C1173/26
Checking status...
ADLighting Systems

Runway 27 right-side PAPI is on test and must not be used.

2026-09-11 12:57 - 2026-11-25 23:59
Duration:3 months

Period of Applicability

2026-09-11 12:57 - 2026-11-25 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The right-side PAPI for runway 27 is on test and must not be used while awaiting flight-check verification.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C1173/26 NOTAMR C0227/26
Q) RPHI/QLPCT/IV/BO /A /000/999/1623N12037E005
A) RPUB B) 2609111257 C) 2611252359
E) PAPI RWY 27 RIGHT SIDE ON TEST, DO NOT USE
(AWAITING FLTCK VERIFICATION).
Was this helpful?