K0560/26
Checking status...
ADTaxiway Operations

Taxiway Y5 deviation is in effect between stands 50 and 56 due to work in progress.

2026-05-13 21:57 - 2026-07-01 12:00
Duration:2 months

Period of Applicability

2026-05-13 21:57 - 2026-07-01 12:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Taxiway Y5 deviation is in effect between aircraft stands 50 and 56 due to work in progress. A portion of the existing taxiway centerline is closed. A temporary taxi route is available for aircraft up to 36 m wingspan to access aircraft stands 41 through 52. Aircraft must follow temporary markings and apron control instructions.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

K0560/26 NOTAMN
Q) SBCW/QMXXX/V/NBO/A/000/999/2249S04315W005
A) SBGL
B) 2605132157 C) 2607011200
E) TWY Y5 DEVIATION IN EFFECT BTN ACFT STAND 50 AND 56 DUE WIP. PORTION OF EXISTING TWY CENTERLINE CLSD. TEMPORARY TAXI ROUTE AVBL FOR ACFT UP TO 36M WINGSPAN TO ACCESS ACFT STAND 41 THRU 52. ACFT SHALL FOLLOW TEMPORARY MARKINGS AND APRON CTL INSTRUCTIONS
Was this helpful?