A1711/26
Checking status...
ADAirport Operations

Grass cutting and heavy equipment operations at the edge of the movement area require tower coordination.

2026-11-04 12:30 - 2026-11-27 20:30
Duration:SHORTaggregated 6 days

Period of Applicability

2026-11-04 12:30 - 2026-11-27 20:30

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Grass cutting is in progress at the edge of the movement area, with heavy equipment operating. Coordinate with the tower. Scheduled November 4–6, 9–13, 16–20, and 23–27, from 1230 to 2030.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A1711/26 NOTAMN
Q) SLLF/QXXHG/IV/NBO/A/000/999/1738S06308W005
A) SLVR B) 2611041230 C) 2611272030
D) NOV 04 TIL 06, 09 TIL 13, 16 TIL 20 AND 23 TIL 27 BTN 1230/2030
E) EDGE MOV AREA GRASS CUTTING INPR EQPT HVY OPS COOR TWR
Was this helpful?