Period of Applicability
2026-03-12 18:12 - 2028-03-12 18:12
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Antonio Rivera Rodriguez Airport takeoff minimums and obstacle departure procedures, Amendment 2A, are changed from March 12, 2026 at 1812 UTC until March 12, 2028 at 1812 UTC estimated. RWY 09 requires 500-2 1/4 with a minimum climb of 260 ft/NM to 900 ft, or 1900-3 for a visual climb over airport (VCOA); depart on heading 089.71° and climb to 1,700 ft before proceeding on course. RWY 27 requires 500-2 1/2 with a minimum climb of 300 ft/NM to 3,000 ft, or 1900-3 for a VCOA. For a RWY 09 or RWY 27 VCOA, obtain ATC approval when requesting IFR clearance and climb in visual conditions to cross Antonio Rivera Rodriguez Airport at or above 1,800 ft before proceeding on course. All other data remains as published.