D1715/25
PERM
Checking status...
ADLighting Systems

Runway 04 approach lighting system is now in operation.

2025-12-24 15:09 - PERM
Duration:PERMANENT

Period of Applicability

2025-12-24 15:09 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Runway 04 approach lighting system has been put into operation, type HIL, CAT I, with a length of 900 m. Reference: AIP AD2. UZFA-10, 2.14 Approach and Runway Lighting.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

D1715/25 NOTAMN
Q) UZTR/QLACS/IV/NBO/A/000/999/4044N07218E005
A) UZFA B) 2512241509 C) PERM
E) RWY 04: APPROACH LIGHTING SYSTEM PUT INTO OPERATION.
TYPE HIL, CAT 1, LENGTH 900M.
REF: AIP AD2. UZFA-10, 2.14 APPROACH AND RUNWAY LIGHTING.
Was this helpful?