D1555/26
Checking status...
ADTaxiway Operations

New Taxiway A at the end of Runway 31 is commissioned.

2026-09-08 06:17 - 2026-11-12 02:00
Duration:3 months

Period of Applicability

2026-09-08 06:17 - 2026-11-12 02:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

The new Taxiway A at the end of Runway 31 is commissioned. It has an asphalt surface, is 25 m wide, and has pavement classification number PCN 77/R/B/W/T.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

D1555/26 NOTAMR D1395/26
Q)UZTR/QMALT/IV/NBO/A/000/999/4135N06038E005
A)UZNU B)2609080617 C)2611120200
E)THE END RWY 31 NEW TWY-A COMMISSIONED:
SURFACE - ASPHALT,
WIDTH - 25M.
PCN 77/R/B/W/T.
Was this helpful?