C1010/09
PERM
Checking status...
ADLighting Systems

PAPI installed and operational on RWY03 and RWY21.

1998-12-21 00:01 - PERM
Duration:PERMANENT

Period of Applicability

1998-12-21 00:01 - PERM

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

PAPI installed and commissioned for RWY21 at 291 m from threshold and 15 m from runway edge, and for RWY03 at 185 m from displaced threshold and 15 m from runway edge. Approach angle 3 degrees.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

C1010/09 NOTAMR C0042/99
Q) VABF/QLPCS/IV/BO /A /000/999/2026N07251E005
A) VADN B) 9812210001 C) PERM
E) PAPI INSTALLED AND COMMISSIONED ON RWY03 AND RWY21 FOR RWY21
AT A DIST OF 291 METRES FM THR AND 15 METRES FM RWY EDGE FOR RWY03
AT A DIST OF 185 METRES FM DISPLACED THR AND 15 METRES FM RWY  
EDGE.
APPROACH ANGLE : 03DEG.
Was this helpful?