Period of Applicability
2026-11-25 06:30 - 2026-11-30 06:30
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Runway 12/30 is unavailable for operations but can be made available within 120 minutes in an emergency. The portion between taxiways L1 and T is available for taxiing with prior coordination with apron control. Scheduled runway 07/25 maintenance will not take place on 28 November 2026 from 0930 to 1130 UTC, contrary to EAIP AD2 VOMM 2.23. Scheduled maintenance at the runway intersection will take place on 28 November 2026 from 0830 to 0930 UTC, as per the AIP.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?