A4373/26
Checking status...
ADRunway Operations

Work is in progress on the runway 03/21 strip alongside runway 03.

2026-11-04 05:05 - 2026-11-14 23:00
Duration:aggregated 8 days

Period of Applicability

2026-11-04 05:05 - 2026-11-14 23:00

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Work is in progress on the runway 03/21 strip, along the left side of runway 03, 145 m from the runway centreline and 1,752 m from the runway 03 threshold. Equipment height is limited to 32 ft. The construction area near the runway will be cleared for safety while the runway is in use. Scheduled for the 4th from 0505–1000 and 1500–2300, and the 5th–14th from 0100–1000 and 1500–2300.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

A4373/26 NOTAMN
Q) VTBB/QMWHW/IV/M/A/000/999/1957N09953E005
A) VTCT B) 2611040505 C) 2611142300
D) 04 0505-1000 1500-2300, 05-14 0100-1000 1500-2300
E) STRIP RWY 03/21 WIP ALONG THE LEFT SIDE OF RWY 03
DIST 145M FM RCL
RMK: 1.MAX EQPT HGT 32FT
2.WORKING DIST 1752M FM THR RWY 03 ON THE LEFT SIDE OF RWY 03
3.CONST AREA NEAR RWY WILL BE CLEARED FOR SAFETY OPS DRG RWY
IN USED
Was this helpful?