Period of Applicability
2026-11-06 07:55 - 2026-11-06 15:55
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
SNOWTAM for ZYHB: Runway 05L was reported wet on all three thirds at 07:55 UTC on November 6 and has been chemically treated. Runway 05R was reported covered with dry snow on all three thirds at 08:15 UTC on November 6. Both runways have a runway condition code of 5 for each third, with 100% coverage reported; contaminant depth was not reported.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?