M1090/26
Checking status...
ADAirport Operations

Prior permission is required for specified aircraft operations at Simmons AAF.

2026-10-01 15:09 - 2026-12-29 23:59
Duration:LONG3 months

Period of Applicability

2026-10-01 15:09 - 2026-12-29 23:59

Timeline Visualization

Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.

7 days free trial, then $24.9/month. Cancel anytime.

Interpretation

Prior permission is required for aircraft not assigned to Simmons AAF, all rotary-wing aircraft requiring engine shutdown, and all fixed-wing aircraft three days before arrival due to weight restrictions, limited parking space, and ARFF status.

Map Visualization

Loading map data
Please wait...
© OpenStreetMap contributors

Raw NOTAM

M1090/26 NOTAMN
Q) ZDC/QFAXX/IV/NBO/A/000/999/3502N07929W005
A) KHFF
B) 2610011509
C) 2612292359
E) PPR REQUIRED FOR ACFT NOT ASSIGNED TO SIMMONS AAF, ALL ROTARY WING ACFT ENGINE SHUTDOWN AND ALL FIXED-WING ACFT THREE DAYS PRIOR TO ARR DUE TO WT RESTRICTIONS, PARKING SPACE LIMITATIONS AND ARFF STATUS
Was this helpful?