Period of Applicability
2025-08-26 14:13 - 2027-08-26 14:13
Timeline Visualization
Get instant access to visual timeline analysis and NOTAM scheduling information with Notamify Pro.
7 days free trial, then $24.9/month. Cancel anytime.
Interpretation
Obstacle departure procedure (ODP) / Diverse Vector Area (radar vectors) at Palm Springs Intl: for RWY 31L the heading is as assigned by ATC and a minimum climb gradient of 480 ft/NM is required to 7,400 ft; for RWY 31R the heading is as assigned by ATC and a minimum climb gradient of 490 ft/NM is required to 7,400 ft; all other published data remains unchanged. Effective period shown: 2508261413-2708261413EST.
Map Visualization
Loading map data
Please wait...
© OpenStreetMap contributors
Raw NOTAM
Was this helpful?